
RecommendedMD520-2T5.5BS-INT
Why this drive The original drive is rated at 22 A in heavy duty. This model supplies 25 A in heavy duty (5.5 kW nominal).
Published capacity covers 33 A for 60 s. Confirm repeat interval.
- Current
- 22 A · published
- Duty
- Heavy duty · default
- Supply
- 200 V AC · 3-phase
- Network
- Confirm at quotation

MD520-2T7.5BS-INT
Capacity The original drive is rated at 22 A in heavy duty. This model supplies 32 A in heavy duty (7.5 kW nominal).
Published capacity covers 33 A for 60 s. Confirm repeat interval.
- Current
- 22 A · published
- Duty
- Heavy duty · default
- Supply
- 200 V AC · 3-phase
- Network
- Confirm at quotation

MD520-2T11BS-INT
Capacity The original drive is rated at 22 A in heavy duty. This model supplies 45 A in heavy duty (11 kW nominal).
Published capacity covers 33 A for 60 s. Confirm repeat interval.
- Current
- 22 A · published
- Duty
- Heavy duty · default
- Supply
- 200 V AC · 3-phase
- Network
- Confirm at quotation
Edit Requirements
Installation Checks and Manuals
What to Confirm
- Confirm the active network, overload cycle, switching frequency and any HVAC or water-control functions in use.
- The comparison uses 200 V AC. Confirm the supply at your site.
- Verify the existing STO circuit, connections and required safety functions.
- Confirm the installed control protocol, or choose No fieldbus in use if the drive uses terminal control.
- Confirm the overload repeat interval against the drive’s documented limits.
- Confirm site temperature and altitude.
- Confirm the switching frequency used for the published rating.
- Confirm motor nameplate and braking requirements before ordering.
Documents
MD520-INT — exact voltage/power options, HD/ND current and carrier-frequency tablesPDFWhat to Confirm
- Confirm the active network, overload cycle, switching frequency and any HVAC or water-control functions in use.
- The comparison uses 200 V AC. Confirm the supply at your site.
- Verify the existing STO circuit, connections and required safety functions.
- Confirm the installed control protocol, or choose No fieldbus in use if the drive uses terminal control.
- Confirm the overload repeat interval against the drive’s documented limits.
- Confirm site temperature and altitude.
- Confirm the switching frequency used for the published rating.
- Confirm motor nameplate and braking requirements before ordering.
Documents
MD520-INT — exact voltage/power options, HD/ND current and carrier-frequency tablesPDFWhat to Confirm
- Confirm the active network, overload cycle, switching frequency and any HVAC or water-control functions in use.
- The comparison uses 200 V AC. Confirm the supply at your site.
- Verify the existing STO circuit, connections and required safety functions.
- Confirm the installed control protocol, or choose No fieldbus in use if the drive uses terminal control.
- Confirm the overload repeat interval against the drive’s documented limits.
- Confirm site temperature and altitude.
- Confirm the switching frequency used for the published rating.
- Confirm motor nameplate and braking requirements before ordering.